10. All ceilings, except balcony ceilings (internal social areas, apartment interiors, hallways)
will be drywall, and suspended ceilings with recessed lighting or light strips will be applied in accordance with
the architectural solution in the lobby, entrance hall and all premises.
11. In bathrooms, the ceiling will be drywall, and the washbasin and shower enclosure will be Huppe.
12. A water tank, sufficient to meet the building's needs for 1 week, will be
reinforced concrete next to the pool machinery room, hygienic waterproofing will be
done, ceramic will be applied and a booster pump will be installed. Products with TSE warranty will be
used.











